PrawoJazdy.study PLDESign in

Tram P1

27 questions · Categories: PT

  1. Do warning signs oblige the tram driver to exercise particular caution?
  2. Is the tram driver obliged to adhere to the warning signs?
  3. Upon seeing this warning sign, should the tram driver expect vehicles entering on to the track?
  4. In this situation, is the tram driver obliged to exercise particular caution?
  5. Does this horizontal marking indicate that the tram driver should expect vehicles that may enter the dedicated track on the right?
  6. Should you in this place, anticipate cars entering on to the dedicated track?
  7. In this situation, is the tram driver obliged to stop just before the line outlined by triangles?
  8. Does the warning sign "frosty road" oblige the tram driver to exercise particular caution?
  9. Does this solid line visible on the right permit other vehicles to enter the track?
  10. Does this warning sign indicate the right of way for trams?
  11. Does this warning sign apply to the tram driver?
  12. Do these signs always oblige the tram driver to stop, in order to yield the right way?
  13. Does this warning sign inform you that in a distance no longer than 100m you will encounter the beginning of road works?
  14. Does this information sign indicate the start of a multi-track section?
  15. In this situation, should you anticipate vehicles that may want to enter the track from the left side?
  16. Do you have the right to drive up to the signalling device when driving through the line marked by rectangles, in the presented situation?
  17. In this situation, are you obliged to stop the tram just before the line constituting of triangles?
  18. Does the visible broken line on the roadway indicate a stop for trams, buses or trolley buses?
  19. Does the visible broken line on the road indicate a parking place for the disabled?
  20. Does this sign prohibit other vehicles on the road from overtaking the tram?
  21. When approaching a place marked with this sign, should you reduce the speed so as not to endanger the safety of pedestrians or cyclists on the pedestrian crossing or level crossing?
  22. When you approach a place marked with this sign, should you reduce the speed so as not to endanger the safety of cyclists entering it?
  23. Does this sign inform you of a pedestrian crossing that may be used by cyclists?
  24. Is the permissible speed for a tram on the road marked with this sign 25 km/h?
  25. Does this speed limit apply to the tram driver?
  26. In this situation, are you approaching an intersection with a track that has the right of way?
  27. In this situation, are you obliged to yield the right of way to vehicles travelling on the transverse road?